Yandex Metrika

How to Perform a Site Survey for a Recuperative Thermal Oxidizer

Introduction

A site survey is an important step in the process of installing a recuperative thermal oxidizer (RTO). A thorough site survey can help identify potential issues and ensure that the RTO is properly sized and installed to meet the needs of the facility. In this article, we will discuss how to perform a site survey for a recuperative thermal oxidizer.

Site Survey Checklist

Performing a site survey for a recuperative thermal oxidizer involves several key steps. Here is a checklist to guide you through the process:

1. Determine the Gas Flow Rate

One of the first steps in performing a site survey for an RTO is to determine the gas flow rate of the process exhaust. This will help determine the size of the RTO needed to effectively treat the exhaust stream. To determine the gas flow rate, you will need to measure the exhaust duct diameter, velocity, and temperature.

2. Evaluate the Exhaust Stream Composition

The composition of the exhaust stream will also impact the design and sizing of the RTO. A site survey should include an evaluation of the exhaust stream composition, including the types and concentrations of contaminants present.

3. Assess Available Space for RTO Installation

Another important aspect of a site survey is to assess the available space for RTO installation. This includes evaluating the size and layout of the facility, as well as any existing equipment or structures that may impact the installation of the RTO. It is also important to ensure that there is adequate space for the necessary ductwork and support structures.

4. Consider Local Regulations and Permits

Before installing an RTO, it is important to consider local regulations and permits. This includes evaluating any emissions limits or other regulatory requirements that may impact the design and operation of the RTO. It is also important to obtain any necessary permits before beginning the installation process.

5. Evaluate Energy Requirements

Recuperative thermal oxidizers require a significant amount of energy to operate. As part of the site survey, it is important to evaluate the energy requirements of the RTO and ensure that the facility has adequate power and fuel sources to meet these requirements.

Conclusion

Performing a thorough site survey is an essential step in the process of installing a recuperative thermal oxidizer. By following the checklist outlined above, facility operators can ensure that the RTO is properly sized and installed to meet their needs and comply with local regulations. With proper installation and operation, an RTO can help facilities reduce emissions and improve overall air quality.

<a href=Rekuperační tepelný oxidátor Image”>


How to Perform a Site Survey for a Recuperative Thermal Oxidizer?

Introduction

Our company is a high-tech enterprise specializing in comprehensive control of volatile organic compounds (VOCs) emissions and carbon reduction energy-saving technology. We have four core technologies: thermal energy, combustion, sealing, and automatic control. Our capabilities include temperature field simulation, airflow field simulation modeling, ceramic regenerative material performance, molecular sieve adsorbent selection, and VOCs high-temperature incineration oxidation testing.

Team Advantages

We have established RTO technology research and development center and exhaust gas carbon reduction engineering technology center in Xi’an, as well as a 30,000 square meter production base in Yangling. We are a leading manufacturer of RTO equipment and molecular sieve wheel equipment worldwide. Our core technical team comes from the Aerospace Liquid Rocket Engine Research Institute. We currently have more than 360 employees, including over 60 R&D technical backbone members, including 3 senior engineers, 6 senior engineers, and 140 thermodynamics doctoral graduates.

Core Products

Our core products are the rotary valve regenerative thermal oxidizer (RTO) and molecular sieve adsorption concentration wheel. With our expertise in environmental protection and thermal energy system engineering, we can provide customers with comprehensive solutions for industrial waste gas treatment and carbon reduction through heat utilization.

Certifications, Patents, and Honors

  • Certifikace systému správy duševního vlastnictví
  • Certifikace systému managementu jakosti
  • Certifikace systému environmentálního managementu
  • Construction Industry Enterprise Qualification
  • High-tech Enterprise
  • Patent for Rotary Valve of Regenerative Thermal Oxidizer
  • Patent for Rotor Regenerative Incineration Equipment
  • Patent for Disk Molecular Sieve Wheel

RTO Factory

How to Choose the Right RTO Equipment

  1. Určete vlastnosti odpadního plynu
  2. Understanding the composition and properties of the waste gas is crucial in selecting the appropriate RTO equipment. Factors such as temperature, flow rate, and VOC concentration should be considered.

    RTO Equipment

  3. Understand local regulations and emission standards
  4. Familiarize yourself with the local regulations and emission standards to ensure compliance with legal requirements.

  5. Vyhodnoťte energetickou účinnost
  6. Assessing the energy efficiency of the RTO equipment is essential for reducing operational costs and maximizing energy utilization.

  7. Zvažte provoz a údržbu
  8. Consider the ease of operation and maintenance of the RTO equipment. Factors such as accessibility for inspections, cleaning, and repairs should be taken into account.

  9. Analýza rozpočtu a nákladů
  10. Perform a thorough budget and cost analysis to ensure that the selected RTO equipment aligns with your financial capabilities.

  11. Select the appropriate RTO type
  12. Choose the RTO type that best suits your specific needs and requirements, such as the rotary valve regenerative thermal oxidizer (RTO) or other variations.

  13. Consider environmental and safety aspects
  14. Take into consideration environmental factors and safety measures when selecting the RTO equipment. This includes emissions control, waste disposal, and safety features.

  15. Testování a ověřování výkonu
  16. Conduct performance testing and verification to ensure that the selected RTO equipment meets the desired operational standards and performance requirements.

Our Service Process

  1. Consultation and evaluation
  2. Initiate initial consultations, conduct on-site inspections, and analyze customer requirements.

  3. Design and solution development
  4. Design customized solutions, perform simulation and modeling, and conduct solution reviews.

  5. Production and manufacturing
  6. Customize production, implement quality control measures, and perform factory testing.

  7. Installation and commissioning
  8. Carry out on-site installation, perform commissioning and operational testing, and provide training services.

  9. After-sales support
  10. Provide regular maintenance services, technical support, and spare parts supply to ensure the long-term performance and reliability of the RTO equipment.

We are a one-stop solution provider with a professional team dedicated to customizing RTO solutions for our clients.

Autor: Miya


cs_CZCS